Hi All -
I have 18 DC's to upgrade from 8r2 to 12r2. I was wondering, if we have an external trust in place on the existing 8R2 PDC holder, what issues could arise if I migrate the pdc role to a new 12r2 server?
Hi All -
I have 18 DC's to upgrade from 8r2 to 12r2. I was wondering, if we have an external trust in place on the existing 8R2 PDC holder, what issues could arise if I migrate the pdc role to a new 12r2 server?